A phased expansion plan 

A phased growth vision for your data center of the future 

A phased expansion plan 

A phased growth vision for your data center of the future 


Phase 1

Hyperscale data center with 150 MW capacity 

Reliable operation based on 100MW of IT load and 150MW of water capacity, maximizing energy efficiency 

with a PUE of 1.3 or less. 5G-based real-time monitoring and advanced cooling technology enhance operational reliability 

and cost efficiency, while proximity to the main power grid and Gyeongsan Substation and excellent transportation 

industrial complex connectivity provide an optimal infrastructure environment.


Power Planning & Operations   Technical Features  Location


Phase 2

Long-term expansion and establishment of a 300 MW capacity cluster 

We will build a data center valley by securing an additional 300,000 pyeong of land and establish a stable energy infrastructure by introducing renewable energy such as hydrogen fuel cells, ESS, and bio-oil. Based on close cooperation with Daegu University, we will promote a collaborative program with educational institutions to train data center operation personnel in the Middle East. This will help us produce world-class professionals and strengthen our role as a talent hub for the international data center industry.


Expandable Sites  Technological advancements  Industry-academia collaboration


Phase 3

Renewable Energy Technology and RE100 Goals 

AI Daegu Data Center (AI DDC) is promoting the creation of a Data Center Valley to realize the ultimate RE100 goal.

To this end, we are collaborating with KEPCO to build a new energy design and introduce eco-friendly energy infrastructure that minimizes carbon emissions. We utilize hydrogen fuel cells and energy storage systems (ESS) to store and supply power reliably, and maximize cooling efficiency through RacK cooling technology and hot zone management systems. 

We also introduce a Net Zero Waste operating model, continue to expand the use of renewable energy, and lead the transition to a sustainable, eco-friendly data center.


Technology Convergence   RE100 Goals


Future Vision

Our vision for the green data center of the future 

We aim to minimize our carbon footprint through green energy solutions and achieve a sustainable data center operating model. We are actively utilizing hydrogen fuel cells and energy storage systems (ESS) to stably supply green power and are building a roadmap to achieve our RE100 goal in the long term. These efforts will be a key driver to establish ourselves as a trusted leader in the global data center market. 


Green energy solutions   A key hub for the digital economy  RE100 Goals & Sustainability

mobile background

Why AI DDC


Scalability

Delivering the massive power and footprint demanded by hyperscale environments.


Efficiency

Optimized cooling and network infrastructure for running high-performance IT equipment.


Reliability

Robust security and operating systems that meet global standards.


Sustainability

Minimize carbon emissions through green design and energy efficiency. 


Comfort

Providing amenities that allow you to work and relax in a comfortable environment.



HQ : 76, Dongnae-ro, Dong-gu, Daegu, Republic of Korea [41061]

Seoul Office : 2F 415 Teheran-ro, Gangnam-gu, Seoul, Korea [06160]

Call : 053 960 0115


E-Mail : info@inuverse.co.kr



Copyright© Inuverse 2025. All rights reserved.

HQ : 10F Korea Mediventure Center, Dong-gu, Daegu, Korea    [41061]

Seoul Office : 2F 415 Teheran-ro, Gangnam-gu, Seoul, Korea   [06160]

Call : 053 960 0115   |  E-Mail : info@inuverse.co.kr


Copyright© Inuverse 2025. All rights reserved.